Completed Projects

Andros Electric Repower Project

IMC worked with Florida Power and Light to replace the existing diesel engine generators with newer, more efficient power generating equipment. The project required overseas transport and on-site transport of equipment. IMC was also responsible for the relocation and termination of all the power cables, fuel lines and exhaust fumes.

Continue Reading

Hydro-Electric Power Station

IMC was contracted by Dominion Energy and Belize Electric Company Limited to perform modifications and repairs to the Chinese-built power station. IMC’s crews were escorted into the rain forest each day to encase the existing dam water piping within a second layer of containment piping.

Continue Reading

Marriott Resort, Aruba

IMC contracted with Marriott International for the mechanical, plumbing and fire protection on this Caribbean resort. We completed this outstanding project and entered into negotiations for the next phase of construction working with our local partners.

Continue Reading

Flag Luxury Properties, LLC & St. Regis Resort Temenos

IMC was selected by Hensel-Phelps to assist in the site development and utilities work to act as the base for all future buildings. IMC was also contracted to assist in the completion of the golf clubhouse. The clubhouse was completed in time for a celebrity-studded grand opening.

Continue Reading

Holiday Inn SunSpree Resort

IMC was the plumbing and air conditioning contractor for this resort. The owner, The Bass Company, was so pleased with our service that they contracted additional work directly with IMC.

Continue Reading

Renaissance Curacao Resort & Casino

IMC was called in to assist the prime contractor in recovering the schedule. IMC was able to mobilize and get the project from four months behind to waiting on outer trades in six weeks. The project included 250+ guest rooms, restaurant, kitchen, casino and pool bar.

Continue Reading

CuisinArt Resort – Anguilla

IMC started this project as the air conditioning, plumbing and electrical subcontractor for an expansion of the existing resort’s spa. The scope of work expanded to include new ocean villas, the Tokyo Bay Restaurant and a new central chilled water plant.

Continue Reading

Integra 360

This development provides residents with easy access to bustling Orlando and Sanford, FL. Each luxury unit has granite countertops, stainless steel appliances, vinyl wood plank flooring, nine-foot ceilings and personal washers and dryers.

Continue Reading

Caspian at Delray

Contemporary urban mixed-use project including apartments, retail and office space. IMC Construction Group completed the electrical scope of work.

Continue Reading
  • 1
  • 2