Replace 51 Base Houses
IMC contracted with Naval Facilities Engineering Command (NAVFAC SE) for the construction of the 51 new homes
IMC contracted with Naval Facilities Engineering Command (NAVFAC SE) for the construction of the 51 new homes
IMC contracted with the US Army Corp of Engineers to provide increased cooling tower capacity.
IMC contracted with the US Army Corp of Engineers to provide Renovation of Building 4901
IMC contracted with the US Army Corp of Engineers to provide increased cooling tower capacity.
Trinity Independent Senior Living is a luxury independent living community located in New Port Richey, Florida
IMC worked with local contractors to install the foundations, set the boiler and complete the boiler piping.
IMC worked with Florida Power and Light to replace the existing diesel engine generators with newer, more efficient power generating equipment. The project required overseas transport and on-site transport of equipment. IMC was also responsible for the relocation and termination of all the power cables, fuel lines and exhaust fumes.
IMC was contracted by Dominion Energy and Belize Electric Company Limited to perform modifications and repairs to the Chinese-built power station. IMC’s crews were escorted into the rain forest each day to encase the existing dam water piping within a second layer of containment piping.
IMC contracted with Marriott International for the mechanical, plumbing and fire protection on this Caribbean resort. We completed this outstanding project and entered into negotiations for the next phase of construction working with our local partners.
IMC was selected by Hensel-Phelps to assist in the site development and utilities work to act as the base for all future buildings. IMC was also contracted to assist in the completion of the golf clubhouse. The clubhouse was completed in time for a celebrity-studded grand opening.
IMC was the plumbing and air conditioning contractor for this resort. The owner, The Bass Company, was so pleased with our service that they contracted additional work directly with IMC.
IMC was called in to assist the prime contractor in recovering the schedule. IMC was able to mobilize and get the project from four months behind to waiting on outer trades in six weeks. The project included 250+ guest rooms, restaurant, kitchen, casino and pool bar.