Aerial Of Chalillo Dam And Reservoir Belize

Hydro-Electric Power Station

IMC was contracted by Dominion Energy and Belize Electric Company Limited to perform modifications and repairs to the Chinese-built power station. IMC’s crews were escorted into the rain forest each day to encase the existing dam water piping within a second layer of containment piping.

  • Location: Belize
  • Project Value: $12,000,000