Hydro-Electric Power Station
IMC was contracted by Dominion Energy and Belize Electric Company Limited to perform modifications and repairs to the Chinese-built power station. IMC’s crews were escorted into the rain forest each day to encase the existing dam water piping within a second layer of containment piping.
- Location: Belize
- Project Value: $12,000,000